Projects & Case Studies
Brief examples illustrating execution methodology and operational results without disclosing sensitive data
Work Methodology
- Analyzing site operational challenges
- Designing an integrated solution and defining clear scope
- Execution, testing, and documented handover
- Maintenance and post-operation follow-up
Case Study Examples
Villa Hegra
📍AlUla, Saudi Arabia
An example of New Ways work in AlUla. This page describes the system scope and project images available for publication.
Scope of Work:
- CCTV systems within the project scope.
- Fire alarm systems within the project scope.
- Smart control systems within the project scope.



Al-Ayam Elite Hotel
📍That Al-Nitaqain St, Mecca
An example of CCTV and security system work for a hotel in Makkah.
Scope of Work:
- IP CCTV Camera Network
- Internet & Networking Infrastructure
- Centralized PBX System
- Smart Door Locks
- Access Control System
- Addressable Fire Alarm System

Association Building
📍AlUla - Al-Aziziyah - Madinah Road
An example of security and technical systems work for a building in AlUla.
Scope of Work:
- IP CCTV Camera Network
- Internet & Networking Infrastructure
- Centralized PBX System
- Smart Locks
- Access Control
- Addressable Early Warning Fire Alarm System

Danan Hotel
📍AlUla - Al-Aziziyah - Madinah Road
An example of security and technical systems work for a hotel in AlUla.
Scope of Work:
- IP CCTV Camera Network
- Internet with Comprehensive Coverage
- Centralized PBX System
- Smart Hotel Locks
- Access Control Systems
- Addressable Smart Fire Alarm System


Burhan Al Diyafa Hotel
📍Mecca
An example of security and technical system work for a hotel in Makkah.
Scope of Work:
- IP CCTV Camera Network
- Internet and Wi-Fi Network
- Centralized PBX System
- Smart Hotel Locks
- Access Control Systems
- Smart Fire Alarm System
